West Milton Bridge Infrastructure
West Milton, Ohio
The project included the construction of a 1,100 foot long sidewalk connecting the existing sidewalks along Haskett and Hamilton Streets to the school. Improvements also included the installation of lighting and construction of a prefabricated steel pedestrian bridge with cast in place abutments. The Kleingers Group was able to successfully shorten the planned delivery schedule on this high profile project to meet the local needs.